Park West Bicycle and Pedestrian Improvements
Omar Santos Baez
Public Works Director
T: (305) 364-6100 x1182
Questions: santoso@miamilakes-fl.gov

Project Quick Facts
- Estimated Completion: TBA
- Construction Cost: $TBA
- Project Manager: TBA
- Project Contractor: TBA
Project will install bike lanes and crosswalks improvements for enhanced pedestrian and bicycle safety-related infrastructure in compliance with the Americans with Disabilities Act.
The Project includes narrowing the travel lanes from 17 ft. to 11 ft., providing 4 ft. protected bike lanes on each side and a new crosswalk. On Montrose Road, the Project includes adding a 4 ft. unprotected bike lane on the West side, enhancing the existing crosswalk, and adding ADA connectivity and ramps throughout Balgowan Road.
Montrose Rd
Balgowan Rd

Florida Department of Transportation (FDOT) Transportation Alternative Program (TAP) grant and People’s Transportation Plan
Thank you for your patience and cooperation as we strive to continue Growing Beautifully.
Project Manager:
TBA
E: Publicworks@miamilakes-fl.gov
O: (305) 512-7133