Currently, the Town of Miami Lakes Public Works Department & CIP are overseeing several projects.
Royal Oaks First Addition Drainage Improvements Project
The Royal Oaks First Addition Drainage Improvements Project is part of the Town’s comprehensive plan to mitigate flooding and is funded through ARPA and the State of Florida.The project is currently in the procurement phase, and construction is scheduled to begin in the fall. The stormwater project will include the addition of catch basins, French drains, manholes, valley gutters as well as restoration and resurfacing of the existing roadway surface, and new pavement markings. Once complete, the new system will increase stormwater management capacity and is intended to mitigate flooding in the area.
Public Notice: Royal Oaks First Addition Drainage Improvements Project
NW 153rd Terrace Drainage Improvements Project
The NW 153rd Terrace Drainage Improvement Project is part of the Town’s comprehensive plan to mitigate flooding and is funded through the Stormwater Utility System Revenue Bonds Series 2021. The project currently under the design phase will impact the right-of-way along NW 153rd Terrace from NW 92nd Avenue to NW 89th Avenue. The stormwater project will include the addition of catch basins, French drains, manholes, valley gutters as well as restoration and resurfacing of the existing roadway surface, and new pavement markings. Once complete, the new system will increase stormwater management capacity and is intended to mitigate flooding in the area.
Public Notice: NW 153rd Terrace Drainage Improvements Project
Commerce Way Drainage Improvements Project
The Commerce Way Drainage Improvement Project is part of the Town’s comprehensive plan to mitigate flooding and is funded through the Stormwater Utility System Revenue Bonds Series 2021. The project currently under the design phase. The stormwater project will include the addition of catch basins, French drains, manholes, valley gutters as well as restoration and resurfacing of the existing roadway surface, and new pavement markings. Once complete, the new system will increase stormwater management capacity and is intended to mitigate flooding in the area..
Public Notice: Commerce Way Drainage Improvements Project
Royal Lakes First Addition Drainage Improvements Project
The Royal Lakes First Addition Drainage Improvement Project is part of the Town’s comprehensive plan to mitigate flooding and is funded through the Stormwater Utility System Revenue Bonds Series 2021. The project currently under the design phase. The stormwater project will include the addition of catch basins, French drains, manholes, valley gutters as well as restoration and resurfacing of the existing roadway surface, and new pavement markings. Once complete, the new system will increase stormwater management capacity and is intended to mitigate flooding in the area.
Public Notice: Royal Lakes First Addition Drainage Improvements Project
Royal Oaks Sixth Addition Drainage Improvements Project
The Royal Oaks Sixth Addition Drainage Improvement Project is part of the Town’s comprehensive plan to mitigate flooding and is funded through the Stormwater Utility System Revenue Bonds Series 2021. The project currently under the design phase. The stormwater project will include the addition of catch basins, French drains, manholes, valley gutters as well as restoration and resurfacing of the existing roadway surface, and new pavement markings. Once complete, the new system will increase stormwater management capacity and is intended to mitigate flooding in the area.
Public Notice: Royal Lakes Sixth Addition Drainage Improvements Project
West Lakes Gardens First Addition Drainage Improvements Project
The West Lakes Gardens First Addition Drainage Improvement Project is part of the Town’s comprehensive plan to mitigate flooding and is funded through the Stormwater Utility System Revenue Bonds Series 2021. The project currently
under the design phase. The stormwater project will include the addition of catch basins, French drains, manholes, valley gutters as well as restoration and resurfacing of the existing roadway surface, and new pavement markings. Once complete, the new system will increase stormwater management capacity and is intended to mitigate flooding in the area.
Public Notice:West Lakes Gardens First Addition Drainage Improvements Project
NW 83rd Place North Drainage Improvement Project
The NW 83rd Place North Drainage Improvement Project is part of the Town’s comprehensive plan to mitigate flooding and is funded through the Stormwater Utility System Revenue Bonds Series 2021. The stormwater project will include the addition of catch basins, French drains, manholes, valley gutters as well as restoration and resurfacing of the existing roadway surface, and new pavement markings. Once complete, the new system will increase stormwater management capacity and is intended to mitigate flooding in the area.
Public Notice: NW 83rd Place North Drainage Improvement Project
NW 159th Terrace Drainage Improvement Project
The NW 159th Terrace Drainage Improvement Project is part of the Town’s comprehensive plan to mitigate flooding and is funded through the Stormwater Utility System Revenue Bonds Series 2021. The stormwater project will include the addition of catch basins, French drains, manholes, as well as restoration and resurfacing of the existing roadway surface, and new pavement markings. Once complete, the new system will increase stormwater management capacity and is intended to mitigate flooding in the area.
Public Notice: NW 159th Terrace Drainage Improvement Project
NW 166th Street Drainage Improvement Project
The NW 166th Street Drainage Improvement Project is part of the Town’s comprehensive plan to mitigate flooding and is funded through the Stormwater Utility System Revenue Bonds Series 2021. The stormwater project will include the addition of catch basins, French drains, manholes, valley gutters as well as restoration and resurfacing of the existing roadway surface, and new pavement markings. Once complete, the new system will increase stormwater management capacity and is intended to mitigate flooding in the area.
Public Notice: NW 166th Street Drainage Improvements Project
Public Notice: Glencairn Roadway Resurfacing Project
NW 83 Place Drainage Improvement Project
The Town of Miami Lakes contractor, RG Underground Engineering, Inc., will be working on the NW 83 Place Drainage Improvements Project. The project consists of drainage and roadway improvements along NW 83 Place between NW 162 Street and NW 158 Terrace. The work is scheduled to begin in November 2021 and be completed by January 2022.
pdf Public Notice: NW 83 Place Drainage Improvement Project (3.44 MB)
The Town of Miami Lakes contractor, Lux Solar, Inc., will be working on the Fairway Drive Crosswalk Improvements Project. The project consists of the construction of a new mid-block crosswalk including installation of in-road lighting, rectangular rapid flashing beacon, milling, and resurfacing pavement markings, and roadway signage. The work is scheduled to begin in November 2021 and be completed by May 2022. The Town of Miami Lakes contractor, RG Underground Engineering, Inc., will be working on the NW 83 Place Drainage Improvements Project. The project consists of drainage and roadway improvements along NW 83 Place between NW 162 Street and NW 158 Terrace. The work is scheduled to begin in November 2021 and be completed by January 2022.
Public Notice: Fairway Drive Crosswalk Project
Montrose Road Crosswalk Project
The Town of Miami Lakes contractor, Lux Solar, Inc., will be working on the Montrose Road Crosswalk Improvements Project. The project consists of improvements to the existing mid-block crosswalk including installation of in-road lighting, rectangular rapid flashing beacon, pavement markings, and roadway signage. The work is scheduled to begin in November 2021 and be completed by May 2022.
Public Notice: Montrose Road Crosswalk Project
- CCTV Traffic Cameras and Adaptive Signalization Installation on 154th Street from 82nd Ave to the Palmetto Expressway
- Safe Routes to School-Miami Lakeway
- West Lakes Drainage and Roadway Improvements
- Safe Routes to School-Bob Graham
- 59th Ave Extension
- NW 83 Place Drainage Improvement
- Streetlights Improvement
comprehensive plan to mitigate flooding and is funded through the
Stormwater Utility System Revenue Bonds Series 2021. The project currently
under the design phase will impact the right-of-way along NW 153rd Terrace
from NW 92nd Avenue to NW 89th Avenue.