NW 59 Ave Roadway Extension Project
Omar Santos Baez
Public Works Director
T: (305) 364-6100 x1182
Questions: santoso@miamilakes-fl.gov

Project Quick Facts
- Estimated Completion: May 2028
- Construction Cost: $TBD
- Project Manager: Omar Santos Baez, P.E.
- Project Contractor: TBD
The project includes the planning, design, and construction of a bridge and roadway improvements to extend NW 59th Ave over the C-8 Canal (Canal #870609) south to the NW 151st St. In addition, the project includes a Complete Streets improvement to NW 151 St /NW 153rd St to facilitate traffic flow at the bridge spine connection.
Affected Streets:
NW 59 AVE from NW 158 ST to NW 151 ST
NW 151 ST/NW 153 ST from Miami Lakeway North to NW 57 CT

The project is currently funded through a combination of HUD CPF Grant, FDOT State-funded Grant (State Appropriations), CIGP Grant, PTP, Road Impact Fees, and the Local Option Fuel Tax.
Thank you for your patience and cooperation as we strive to continue Growing Beautifully.
Project Manager:
Omar Santos Baez, P.E.
E: santoso@miamilakes-fl.gov
O: (305) 512-7133