Project Quick Facts

  • Estimated Completion: November, 2025
  • Construction Cost: $1,728,293.39
  • Project Manager: TBA
  • Project Contractor: Pedrail System, LLC
Overview

The project is part of the Town’s comprehensive plan to mitigate flooding. The project consists of drainage system improvements.

Details

The stormwater project will include the addition of catch basins, French drains, manholes, valley gutters as well as restoration and resurfacing of the existing roadway surface, and new pavement markings.

NW 78 Pl

NW 82 Pl

NW 82 Ct

NW 83 PL

NW 83 Ave

NW 83 Ct

NW 165 Ter

NW 165 St

NW 168 Ter

NW 169 Ter

Funding Source

Stormwater Utility System Revenue Bonds Series 2021

Contact