Fairway Dr Bike Lanes and Crosswalk Improvements
Omar Santos Baez
Public Works Director
T: (305) 364-6100 x1182
Questions: santoso@miamilakes-fl.gov
Project Quick Facts
- Estimated Completion: TBA
- Construction Cost: $TBA
- Project Manager: TBA
- Project Contractor: TBA
Fairway Drive lacks bicycle and pedestrian infrastructure needed to serve the growing residential and commercial population in this area of the Town.
This project includes the design, permitting, and construction of bike lanes and crosswalk improvements for enhanced pedestrian and bicycle safety-related infrastructure in compliance with the Americans with Disabilities Act.
Fairway Drive
State appropriations managed by the Florida Department of Transportation (FDOT)
Thank you for your patience and cooperation as we strive to continue Growing Beautifully.
Project Manager:
TBA
E: Publicworks@miamilakes-fl.gov
O: (305) 512-7133