Project Quick Facts

  • Estimated Completion: May 2022
  • Construction Cost: $191,795
  • Project Manager: Omar Santos Baez
  • Project Contractor: Lux Solar, Inc
Overview

The Town of Miami Lakes contractor, Lux Solar, Inc., will be working on the Fairway Drive Crosswalk Project.

Details

The Fairway Drive Crosswalk consists of the construction of a new mid-block crosswalk including installation of in-road lighting, rectangular rapid flashing beacon, milling, and resurfacing pavement markings, and roadway signage.

Expect daily temporary lane closures within Fairway Drive.

Please follow posted signs and drive with caution in the area. The contractor will coordinate with neighbors to maintain access to the roadway and properties throughout the life of the project.

Funding Source

Contact

Thank you for your patience and cooperation as we strive to continue Growing Beautifully.

Project Manager:

Omar Santos Baez, P.E., Public Works Director

E: santoso@miamilakes-fl.gov

O: (305) 364-6100

Medi