NW 159th Terrace Drainage Improvement

Northwest 159th Street

Omar Santos Baez

Public Works Director

T: (305) 364-6100 x1182
Questions: santoso@miamilakes-fl.gov

NW 159th Terrace Drainage Improvement map

Project Quick Facts

  • Estimated Completion: October 2022
  • Construction Cost: $263,950
  • Project Manager: Anaily Padron, P.E.
  • Project Contractor: Anaily Padron, P.E.
Overview

The NW 159th Terrace Drainage Improvement Project is part of the Town’s comprehensive plan to mitigate flooding. The project consists of drainage system improvements along NW 159th Terrace.

Details

The stormwater project will include the addition of catch basins, French drains, manholes, as well as restoration and resurfacing of the existing roadway surface, and new pavement markings. Once complete, the new system will increase stormwater management capacity and is intended to mitigate flooding in the area.

Funding Source

The Commerce Way Drainage Improvement project is funded through the Stormwater Utility System Revenue Bonds Series 2021.

Contact

Thank you for your patience and cooperation as we strive to continue Growing Beautifully.

Project Manager:

Anaily Padron, Capital Improvement Project Manager

E: padrona@miamilakes-fl.gov

O: (305) 512-7133